reno logo
phone icon 0433 129 417

A Renovation Specialist will answer your call!

Website Disclaimer
Stress Free Renovations
ABN: 65684515759
NSW Contractor Licence: BUP0000415

General Information
The information provided on this website is for general informational purposes only. While Stress Free Renovations is a licensed renovation and building contractor operating in Sydney, New South Wales, the content on this website does not constitute formal quotations, binding estimates, or contractual obligations unless specifically stated in a written agreement signed by both parties.
Australian Building Standards and Regulations
All renovation and building work must comply with:

The Building Code of Australia (BCA)
Australian Standards (AS)
NSW Environmental Planning and Assessment Act 1979
Local council requirements and Development Control Plans (DCPs)
The Home Building Act 1989 (NSW)

Building regulations, Australian Standards, and local council requirements are subject to change. The information on this website may not reflect the most current regulations. It is your responsibility to ensure compliance with all applicable laws and regulations at the time of your project.
Permits and Approvals
Many renovation projects require:

Development Applications (DA)
Complying Development Certificates (CDC)
Construction Certificates (CC)
Occupation Certificates (OC)
Council approvals
Strata approval (for strata properties)
Heritage approval (for heritage-listed properties)

We can advise on what may be required for your project, but you should verify all permit and approval requirements with your local council and relevant authorities. Undertaking building work without required approvals may result in fines, orders to cease work, or requirements to remove completed work.
Site-Specific Conditions
Every property is unique. The feasibility, scope, and cost of renovation work can be affected by:

Structural conditions and building integrity
Asbestos or hazardous materials
Soil conditions and site drainage
Heritage overlays or conservation areas
Easements and covenant restrictions
Utility locations and services
Access constraints
Unforeseen conditions discovered during demolition or construction

Estimates and project timelines provided are subject to site inspection and may change based on actual site conditions discovered during the course of work.
Home Building Compensation Fund
In accordance with NSW law, all residential building work over $20,000 (including GST) requires Home Building Compensation Fund (HBCF) insurance. This insurance protects homeowners if the builder dies, disappears, or becomes insolvent, or if the building work is incomplete or defective.
We will provide HBCF insurance certificate where required by law before commencing work.
Licensing and Insurance
Stress Free Renovations holds:

NSW Contractor Licence Number: BUP0000415
Public Liability Insurance: Diclosed on start of project.
You have the right to request proof of our licensing and insurance before entering into any contract. You should verify any contractor’s credentials through NSW Fair Trading before engaging their services.
Pricing and Quotations
Estimates
Estimates provided on this website or in initial consultations are approximate only and are based on typical project parameters. They are not binding quotations.
Formal Quotations
Formal written quotations will be provided following a detailed site inspection and consultation. Quotations are valid for [60] days from the date of issue unless otherwise specified.
Final Pricing
Final pricing may vary from quotations if:

Site conditions differ from those anticipated
Client changes the scope of work
Unforeseen structural or building issues are discovered
Material costs increase
Additional permits or approvals are required
Access or working conditions differ from assessment

All variations will be discussed and approved in writing before proceeding.
Project Timelines
Project timelines are estimates based on typical conditions and are subject to:

Weather conditions (particularly for external work)
Material and product availability
Council and authority approval timeframes
Subcontractor availability
Discovery of unforeseen conditions
Client-requested changes
Coordination with other trades

We will make reasonable efforts to complete work within estimated timeframes but cannot guarantee specific completion dates unless expressly agreed in writing.
Materials and Products
Availability
Product availability can change. If specified products become unavailable, we will propose suitable alternatives for your approval.
Samples and Displays
Colours, textures, and finishes may vary from samples, website images, or display products due to:

Manufacturing batch variations
Natural variations in materials
Screen display differences
Lighting conditions
Age and weathering

Warranties

Product warranties are provided by manufacturers and suppliers. We will assist with warranty claims but are not responsible for manufacturer defects or warranty limitations.
Images and Project Examples
Project images and case studies shown on this website are examples of our work. They are provided for inspiration and to demonstrate our capabilities. Your project results may differ based on:

Your specific property and site conditions
Your design preferences and selections
Your budget parameters
Current product availability
Applicable building regulations

Images may have been digitally enhanced for presentation purposes.
External Links and Third-Party Content
This website may contain links to external websites or reference third-party products, services, or suppliers. We do not endorse or assume responsibility for:

The accuracy of third-party content
The quality of third-party products or services
The business practices of external companies
The availability or pricing of third-party products

Sydney and NSW Specific Considerations
Renovation work in Sydney may be subject to additional considerations including:

Sydney Water and other utility requirements
Bushfire-prone land regulations
Flood planning requirements
Acid sulfate soil management
Contaminated land provisions
Tree preservation orders
Sydney Harbour foreshore and waterways regulations (for waterfront properties)

We will advise on known requirements, but you should verify all applicable regulations with relevant authorities.
Asbestos
Many properties built before 1987 contain asbestos materials. Under NSW law:

Asbestos must be identified before renovation work commences
Licensed asbestos removalists must remove friable asbestos
Asbestos removal must comply with SafeWork NSW requirements
Asbestos removal may require notification to SafeWork NSW

If asbestos is discovered during your project, work may need to be suspended until proper removal is completed. Additional costs will apply for asbestos testing and removal.
Limitation of Liability
To the fullest extent permitted by Australian law:
Website Information
We make no warranties or representations about the accuracy, completeness, or timeliness of information on this website. We are not liable for any decisions made based on website content.
Statutory Rights
Nothing in this disclaimer excludes, restricts, or modifies any consumer rights or guarantees that cannot be excluded under the Australian Consumer Law, including the consumer guarantees for services.
Liability Cap
Our liability for any claims arising from the use of this website (excluding claims related to actual contracted building work) is limited to the cost of supplying the information again.
Building Work
Liability for building work we perform is governed by the terms of our written contracts and by the Home Building Act 1989 (NSW) and Australian Consumer Law.
Privacy and Data Protection
Personal information collected through this website is handled in accordance with:

The Privacy Act 1988 (Cth)
Australian Privacy Principles (APPs)
Our Privacy Policy (available at https://stressfreerenovations.com.au/privacy-policy/)

Intellectual Property
All content on this website, including text, images, logos, and designs, is protected by copyright and is the property of [Your Company Name] or used under licence. You may not reproduce, distribute, or use our content without written permission.
Contract Terms
This disclaimer does not form part of any contract for building work. Contracted building work is governed by:

Our written contract and quotation
The Home Building Act 1989 (NSW)
Australian Consumer Law
Other applicable laws and regulations

Updates and Changes
We reserve the right to update or modify this disclaimer at any time without notice. The current version is always available on our website.
Contact and Complaints
If you have questions, concerns, or complaints:
Stress Free Renovations
ABN: 65684515759
NSW Contractor Licence: BUP0000415
Address:
Level 2, 63 Dixon Street
Haymarket, NSW 2000
Contact:
Phone: 0433 129 417
Email: andrew@stressfreerenovations.com.au
Website: stressfreerenovations.com.au
Regulatory Bodies:
For licensing and building work complaints:
NSW Fair Trading
Phone: 13 32 20
Website: www.fairtrading.nsw.gov.au
For workplace safety concerns:
SafeWork NSW
Phone: 13 10 50
Website: www.safework.nsw.gov.au

Important Notice
This disclaimer is a general guide only. We recommend you:

Obtain independent legal and financial advice before committing to any building work
Verify all licensing and insurance credentials
Obtain and review all necessary building approvals
Ensure you have a detailed written contract before work commences
Keep copies of all quotes, contracts, invoices, and correspondence
Understand your rights under Australian Consumer Law and the NSW Home Building Act

Your Statutory Rights
Nothing in this disclaimer is intended to exclude, restrict, or modify your rights under the Australian Consumer Law or other applicable laws. If any term of this disclaimer is inconsistent with your statutory rights, your statutory rights prevail to the extent of the inconsistency.